Modern kitchen renovation with white cabinets and island
Home / Project Timeline

Custom Kitchen Cabinet Timeline.

Most Evoke kitchen projects take 10 to 16 weeks from first conversation to final walkthrough. Here is the realistic week-by-week breakdown.

The Timeline

Six Stages. One Clear Timeline.

Every custom kitchen moves through six clear stages. Knowing the typical week range for each helps you plan, ask better questions, and avoid surprises.

  1. Initial Consultation — Weeks 1 to 2

    We meet in our Saskatoon showroom or at your home to discuss how you use your kitchen, your preferred start date, and your investment range. We confirm the project timeline up front so you can plan around holidays, travel, and daily life.

  2. Design & Measurements — Weeks 2 to 5

    Our designer records every wall length, ceiling height, window opening, and mechanical location, then builds a detailed plan in our design software. You receive floor plans, elevations, and 3D renderings showing cabinet placement and traffic flow.

  3. Material & Finish Selection — Weeks 4 to 6

    Together we choose cabinet door styles, wood species, colours, hardware, countertops, and fixtures. Every selection is written into the final specification and reflected in the final quote before production begins.

  4. Final Approval & Production — Weeks 7 to 14

    Once you approve every detail, we begin building in our Saskatoon workshop. Production typically takes 6 to 10 weeks depending on complexity and material availability.

  5. Site Preparation & Delivery — Weeks 13 to 15

    We coordinate demolition, plumbing, electrical, and flooring trades if needed, then deliver cabinets when the site is clean, dry, and ready. Each piece is inspected before it leaves our shop.

  6. Installation & Final Walkthrough — Weeks 15 to 16

    Installation usually takes 2 to 5 days depending on kitchen size. Our installers place, level, and adjust every cabinet, then finish with a walkthrough to confirm every drawer, door, and surface meets our standard.

Stage by Stage

What Happens at Each Stage

Below is a closer look at timelines, deliverables, and what you will experience as your kitchen moves from concept to completion.

Kitchen consultation at showroom
Stage 01

Initial Consultation — Weeks 1 to 2

The first conversation is about listening. We want to understand how your household uses the kitchen, what frustrates you about the current layout, and which features matter most. Some clients bring photos or Pinterest boards; others arrive with a rough idea. Both are fine.

During this stage we also review your investment range and preferred start date. If the scope feels right, we schedule an on-site visit to confirm measurements and assess structural conditions like wall locations, soffits, and plumbing rough-ins.

Custom kitchen design drawings
Stage 02

Design & Measurements — Weeks 2 to 5

Accurate measurements are the foundation of a well-fitted kitchen. Our designer records every wall length, ceiling height, window opening, and mechanical location, then builds a detailed plan in our design software.

You will receive floor plans, elevations, and 3D renderings showing cabinet placement, appliance locations, and traffic flow. This is when we refine the island size, pantry layout, and storage accessories. Revisions are normal here, and we encourage questions until the design feels exactly right.

Cabinet materials and finishes
Stage 03

Material & Finish Selection — Weeks 4 to 6

With the layout approved, we move into finishes. This includes door profiles, wood species, paint or stain colours, countertop materials, backsplash options, hardware, lighting, and sink fixtures. We keep samples in our showroom so you can compare combinations side by side.

Every choice is recorded in a written specification and reflected in the final quote. Once you sign off, materials are ordered and production is scheduled. Changes after this point can affect both timeline and cost, so we take extra time here to make sure you are confident.

Cabinet production workshop
Stage 04

Final Approval & Production — Weeks 7 to 14

Production typically takes 6 to 10 weeks depending on complexity and material availability. Your project manager monitors each step, from material arrival through cutting, assembly, sanding, finishing, and final inspection.

While cabinets are being built, we stay in touch about site readiness. If you are managing your own contractor for demolition or rough trades, we provide delivery timing so they can schedule accordingly. Our in-house coordination is available if you prefer us to manage the full schedule.

Kitchen cabinets ready for delivery
Stage 05

Site Preparation & Delivery — Weeks 13 to 15

Before delivery, the space must be clean, dry, and at a stable temperature. Flooring should be finished if it runs under cabinets, and rough plumbing and electrical should be in place. We coordinate delivery for a day when the site is ready and protected from weather.

Each cabinet is wrapped and loaded carefully. On delivery day, our team places boxes in the correct rooms to make installation efficient. We inspect for any shipping concerns before installers begin.

Completed custom kitchen installation
Stage 06

Installation & Final Walkthrough — Weeks 15 to 16

Installation usually takes 2 to 5 days depending on kitchen size. Our installers level base cabinets, hang uppers, install panels and trim, and attach hardware. We connect sinks, faucets, and appliances only when those trades are part of our scope.

After installation, we walk the space with you to confirm alignment, finish quality, hardware function, and cleanliness. Any final adjustments are scheduled promptly. We also explain care instructions and warranty coverage before handing over your new kitchen.

At a Glance

Typical Timeline by Project Type

Not every kitchen project follows the same schedule. The biggest variables are scope, material lead times, and who coordinates the trades.

Project Type Typical Timeline Best For Trade Coordination
Full Design-Build Kitchen 10 to 16 weeks Homeowners who want one team accountable for design, build, and install Managed by Evoke
Cabinets Only 6 to 10 weeks after final approval Homeowners with their own contractor handling demolition and rough trades Split between you and Evoke
Bath Vanity or Small Built-In 6 to 12 weeks Smaller spaces with fewer trades and simpler installation Usually minimal
DIY or Separate Contractors Highly variable, often 20+ weeks Experienced renovators with flexible schedules Managed by you
Large or Complex Kitchen 14 to 22 weeks Projects with custom islands, built-ins, or specialty materials Managed by Evoke
Material Shortage or Custom Order Add 2 to 6 weeks Projects using imported stone, specialty hardware, or back-ordered finishes Managed by Evoke
Rush or Off-Season Request Possibly shorter; ask during consultation Projects with flexible design scope or simple materials Managed by Evoke
Plan Ahead

What Can Speed Up or Slow Down the Schedule

A few decisions and conditions have the biggest impact on how long your project takes. Understanding them early helps you avoid delays.

Decisions Made Early

Saves Time

Finalizing layouts, finishes, and fixtures before production begins prevents change orders that add weeks. We build extra time into the design phase so you are never rushed.

Site Readiness

Avoids Delays

Demolition, rough plumbing, electrical, and flooring should be complete before cabinets arrive. A site that is not ready can push installation back by days or weeks.

Material Lead Times

Plan Around

Imported stone, specialty hardware, or back-ordered finishes can add 2 to 6 weeks. We flag these during selection and suggest alternatives if timing is tight.

A realistic timeline gives you confidence. You will know when decisions are due, when cabinets arrive, and when your kitchen will be finished.
Evoke Cabinets, Saskatoon
Timeline Questions

Questions About Cabinet Project Timelines

Here are answers to the timeline questions we hear most often from Saskatoon homeowners planning a custom cabinet project.

How long does a custom kitchen cabinet project take from design to installation?

Most custom kitchen cabinet projects take 10 to 16 weeks from signed approval to final installation. The design and selection phase usually adds 3 to 6 weeks before production begins, so the full journey from first conversation to finished kitchen is typically 13 to 22 weeks.

What can delay my cabinet project?

The most common delays are late design decisions, unfinished rough trades, back-ordered materials, and changes after production begins. We provide a detailed schedule at the start and flag risks early so you can avoid them.

How long does production take once I approve the design?

Production typically takes 6 to 10 weeks after final approval, depending on kitchen size, material availability, and finish complexity. Your project manager monitors every step and updates you if anything shifts.

Can you rush a cabinet project?

Sometimes. Simpler designs, in-stock materials, and flexible installation dates can shorten the schedule. Ask during your consultation and we will tell you honestly what is possible without sacrificing quality.

How do I keep the project on schedule?

Make decisions by the agreed dates, keep the site ready for each trade, and avoid changes after materials are ordered. Our project manager sends reminders and checklists so nothing falls through the cracks.

When should I order countertops and appliances?

Countertops are templated after cabinets are installed, so order them once the design is approved. Appliances should be on site before installation begins so our team can verify opening sizes and connections.

Start Your Project

Get in touch.

Whether you're ready to begin or simply gathering ideas, we'd love to hear about your project. Book a consultation and let's talk about your space.

(306) 728-2182After hours: 1-855-68-EVOKE820 45th Street West, Saskatoon, SK
Mon-Fri 8am-5pm, Sat by appointment